ISTANBUL / KARTALFrom metering to installation.0532 255 28 34
URAL.ENGINEERING
Maintenance and systems

Converting vertical and horizontal distribution

Review the distribution layout before choosing a device.

Understand the existing system

Vertical risers and horizontal apartment distribution require different measurement solutions. Purchasing a heat meter alone does not complete a conversion.

Design scope

Resolve pipe routes, common-area crossings, work inside apartments, hydraulic balancing, insulation and meter locations in the design.

Implementation sequence

Once management decisions and approvals are established, carry out installation, testing, balancing and initial readings. Preserve existing consumption records until the changeover date.

THE RIGHT START FOR YOUR BUILDING

Your building.
Let us assess it together.

Discuss your project
Call nowRequest a quote
IMPORTANT INFORMATION

Information on Tiered Natural Gas Pricing and Heat Cost Allocation

Following BOTAŞ’s announcement dated 3 April 2026, within the framework of the Energy Market Regulatory Authority (EPDK) and BOTAŞ regulations, tiered pricing for residential consumers took effect on 4 April 2026.

Under this scheme, the government subsidy varies by consumption tier, increasing the price paid per cubic metre. Depending on the region and consumption level, the difference in unit costs between Tier 1 and Tier 2 ranges from 60% to 80%.

Although total natural gas bills issued to buildings have increased, no changes have been made to the Regulation on the Allocation of Heating and Domestic Hot Water Costs in Central Heating and Hot Water Systems. Accordingly, costs continue to be calculated and allocated using individual unit meter readings and the building’s current natural gas invoice amount.

SOURCES

Learn more ↗

Contact us

CONTACT US

Leave a message.

Send your request to our sales team.

Your information is used only to assess and respond to your request. No marketing consent is requested.