ISTANBUL / KARTALFrom metering to installation.0532 255 28 34
URAL.ENGINEERING
FROM METERING TO INSTALLATION · URAL MÜHENDİSLİK

Every building.
Smarter solutions.

We measure heat and water consumption and make cost allocation clear. With natural gas projects and mechanical installations, we consider your building’s systems together.

Illustrative heat meterAn original, unbranded meter illustration explaining Ural’s metering services.HEAT METERENERGY0000800.0kWhM-Bus / RFILLUSTRATIVE READINGHeat + waterMetering solutionsM-Bus / RFRemote readingClear calculationCost allocation
METERING
Heat and water
READING
RF and M-Bus
INSTALLATION
Design and installation
REPORTING
Apartment-level
HEAT METERSHEAT COST ALLOCATORSM-BUSRFNATURAL GASCENTRAL HEATINGMECHANICAL SYSTEMSCOST ALLOCATIONHEAT METERSHEAT COST ALLOCATORSM-BUSRFNATURAL GASCENTRAL HEATINGMECHANICAL SYSTEMSCOST ALLOCATION
OUR SERVICES

Different requirements.
One engineering approach.

From meters to plant rooms and from design to reporting, we assess the building as a whole.

Illustrative heat meterAn original, unbranded meter illustration explaining Ural’s metering services.HEAT METERENERGY0000800.0kWhM-Bus / RFILLUSTRATIVE READING
01 / 05 · URAL MÜHENDİSLİK

Meter reading and cost allocation

We assess heat meters, heat cost allocators and water meters within a consistent reading period. We define the inventory, reading method and reporting scope to suit your building.

  • Matching meters to individual units
  • Period readings and anomaly checks
  • Separating heating and hot-water costs
Explore this service
01 / 05
All services
01020304
M-Bus
RF
kWh
m³
HOW IT WORKS

From metering to reporting,
a traceable process.

  1. 01

    Metering

    Device inventories and consumption records for each period are checked together.

  2. 02

    Data collection

    M-Bus, RF or on-site reading is assessed according to the existing infrastructure.

  3. 03

    Allocation

    Heating costs become an explainable calculation based on area and consumption data.

EXPLORE URAL

Make informed decisions.
Stay a step ahead.

OUR PROCESS

From survey to operation.

A process that makes the scope and outcome of every step clear.

  1. 01

    Site survey

    We review the building’s installation, meters and requirements.

  2. 02

    Planning

    We define the scope, equipment compatibility and work sequence.

  3. 03

    Installation

    We carry out installation, reading and commissioning.

  4. 04

    Verification

    We verify device assignments and initial-period records.

  5. 05

    Monitoring

    We monitor period data and system behaviour.

URALMeasure.
Understand.
Improve.
ENGINEERING
WHY URAL

Engineering for
your whole building.

  • Technical clarity

    We explain the scope and conditions of each recommendation clearly.

  • Consistent records

    We keep metering, replacement and inspection steps traceable through consistent records.

  • System compatibility

    We assess equipment against existing infrastructure and project requirements.

About Ural
KNOWLEDGE CENTRE

Answers to your questions,
all in one place.

23 guides covering heat meters, tiered gas thresholds, maintenance and cost allocation.

Explore the guides Cost allocation calculator
FREQUENTLY ASKED QUESTIONS

Clear information.
Clear answers.

Are heat meters and heat cost allocators the same?

No. A heat meter measures transferred heat energy; a radiator-mounted allocator produces a consumption share for cost allocation. The distribution layout determines the appropriate solution.

Can every meter be read remotely?

No. The device module, protocol and installed reading infrastructure must be compatible. A preliminary review using the model and serial number is a good starting point.

What information is needed for a quotation?

Building location, number of units and meters, device make and model, current installation or reading method and the requested scope are sufficient to begin.

Does the calculator show my actual bill?

The tool shows the basic area and consumption allocation for central heating using the entered values. Hot water and special cases require separate assessment. The result is not an official cost statement.

Why does an empty apartment pay a common share?

The common share in central heating is based on area. Not using an apartment does not automatically remove this contribution. Check area and consumption items separately.

What should I do if a meter is faulty?

Record a display photo, serial number and error code and notify management. Do not interfere with the seals or device; technical checks and the allocation method must be assessed together.

THE RIGHT START FOR YOUR BUILDING

Your building.
Let us assess it together.

Discuss your project
Call nowRequest a quote
IMPORTANT INFORMATION

Information on Tiered Natural Gas Pricing and Heat Cost Allocation

Following BOTAŞ’s announcement dated 3 April 2026, within the framework of the Energy Market Regulatory Authority (EPDK) and BOTAŞ regulations, tiered pricing for residential consumers took effect on 4 April 2026.

Under this scheme, the government subsidy varies by consumption tier, increasing the price paid per cubic metre. Depending on the region and consumption level, the difference in unit costs between Tier 1 and Tier 2 ranges from 60% to 80%.

Although total natural gas bills issued to buildings have increased, no changes have been made to the Regulation on the Allocation of Heating and Domestic Hot Water Costs in Central Heating and Hot Water Systems. Accordingly, costs continue to be calculated and allocated using individual unit meter readings and the building’s current natural gas invoice amount.

SOURCES

Learn more ↗

Contact us

CONTACT US

Leave a message.

Send your request to our sales team.

Your information is used only to assess and respond to your request. No marketing consent is requested.